Before drawing: what we check in Lachute
The urban planning bylaw changes from one sector to another. Before the first line is drawn, we check what your lot allows.
- Urban perimeter: In serviced areas, setbacks and the land coverage ratio guide where a home addition or a garage can sit.
- Older buildings: Century-old homes call for a careful survey: Catherine specializes in restoring this type of building.
- Agricultural edges: On the outskirts of the territory, the protected agricultural zone limits uses and construction.
The four steps of the Express Plan
Here is how a project unfolds with the Express Plan, from the first conversation to filing. With the Signature Plan, we add research, design and teamwork with other professionals, and the project takes a few weeks to a few months. In both cases, the timelines of the City, the CCU and the PIIA are not ours.
- Starting meeting: You arrive with your documents in hand. Your project, your lot: we check what your municipality's regulations allow, confirm that the Express Plan suits you and send you a service offer, valid for 60 days. If a survey of the existing building is needed, it is done at this stage.
- Our plans, in about 2 weeks: Once we receive your payment and your documents, we draw your complete plans: site plan, floor plans, elevations, sections and details, signed by a T.P. when needed. The timeline is paused while we wait for documents or for an engineer.
- One round of changes: You tell us what you want adjusted, and we update your plans.
- Delivery and filing: You receive your plans in PDF format and file the application with the municipality. Drawing files (.dwg) are never handed over: they are our intellectual property. Once the plans are finalized, any change is billed hourly ($125/hour).
Documents to gather
To get started, we need:
- The certificate of location or the land survey plan
- The existing plans of the house, if you have them
- Photos of the lot and the building
- Your sketches and inspiration images, or a Pinterest board to share with us
- Your budget, for the Signature Plan
- Your municipality's requirements, if you know them, including any CCU or PIIA review
Who files the application?
You do, as the owner. We support you: we prepare the plans that are required and answer the municipality's questions. If the City asks for changes, we adjust the plans.
Confirming with the City
Fees, timelines and exact documents vary with the project and the sector. The urban planning department of the City of Lachute is the only official source. We help you ask it the right questions.


