From construction site to finished house
Insulated block house

In pictures
The finished house

The finished house 
The finished garage
1 / 2
The interiors and surroundings

The electrical room, before the slab 
The partitions framed 
The basement and its staircase 
The staircase, protected during the work 
The kitchen being finished
1 / 5
The construction site and plans

The construction site 
The insulated block walls 
The start of construction 
The first courses of insulated blocks 
The foundation formwork 
The walls go up, with their opening frames 
The insulated-block front 
Pouring concrete into the blocks 
Walls finished, framing begins 
The roof trusses going on 
The trusses, seen from the side 
The roof in place 
Under the trusses, from inside 
Aerial view of the site 
The front, before the cladding 
The white siding goes on 
The house lit up at night 
The foundation plan 
The ground-floor plan 
The roof plan 
The front elevation 
The rear elevation 
The right elevation 
The left elevation 
The garage: foundation and ground floor 
The garage roof plan 
The front and rear garage elevations 
The left and right garage elevations
1 / 28
House plans: in collaboration with Les Dessins Drummond Inc.
A similar project?
Tell us about your project: we reply with the next steps and an estimate.